Labels

Showing posts with label E-waste. Show all posts
Showing posts with label E-waste. Show all posts

Wednesday, September 16, 2026

Datacenter rush will create ‘tsunami’ of discarded electronics, report says: Global push will triple toxic e-waste annually in 25 years, filling enough shipping containers to circle globe six times

Datacenter equipment won’t be designed for repair and reuse, the report projects, and would need to be completely replaced every two to five years. Photograph: Tatsiana Volkava/Getty Images

  in The Guardian

Wed 16 Sep 2026

The electronic trash AI generates in the next 25 years could fill enough shipping containers to encircle the globe six times, it said. Yet, says the report by the non-profit environmental group Basel Action Network (BAN), there is no plan to deal with that waste – which typically contains toxics like lead, mercury, cadmium and forever chemicals, as well as valuable metals that are challenging to reclaim.

“Already electronic waste is the fastest-growing waste stream on the planet and only one-fifth is properly managed,” said Jim Puckett, co-founder of BAN, which works to see that toxic waste doesn’t end up getting dumped on the world’s poorer communities.

Experts concur. “We’re doing a terrible job of handling e-waste in the US,” said Vince Beiser, author of the book Power Metal, which details the global problems of trying to reclaim valuable metals inside electronic goods. “Some of it gets dumped overseas. Most of it just gets dumped in landfills, which is a problem because it can leach all kinds of nasty things into the water, into the soil.”

There are 4,871 new datacenters in the construction pipeline in the US, the report said, adding that, while not all are clearly designated for use by AI, many will be.

It calculated the volumes of e-waste related to computer servers used for AI, and to “the thousands of tonnes of copper, steel, concrete” for cooling, power distribution, networking and energy storage equipment needed to operate inside datacenters.

To estimate the total, the report estimated the amount of computing power analysts project will be built – totalling roughly 100 gigawatts of new capacity worldwide by 2030 alone and growing beyond... READ MORE  https://www.theguardian.com/world/2026/sep/16/datacenters-pollution-electronics

    AS ALWAYS PLEASE GO TO THE LINK TO READ GOOD ARTICLES (or quotes) IN FULL: HELP SHAPE ALGORITHMS (and conversations) THAT EMPOWER DECENCY, DIGNITY, JUSTICE & PEACE... and hopefully Palestine, or at least fair and just laws and policies here, there- and everywhere]

Wednesday, June 3, 2026

Brockovich AI Data Center Reporting- Community Awareness Initiative | Your voice matters. Report. Engage. Protect. ... Key Concerns with AI Data Centers USA "When residents and councils want time to study the impact before approving more data centers, they're enacting temporary pauses. These moratoriums vary in duration and scope, but they share a goal: don't let the buildout get ahead of the planning."

 


AI Data Centers &
Our Communities

An initiative by Erin  ·  Environmental Advocate

"The RACE to build AI infrastructures is unfolding town by town across America. In some places, data centers are welcomed. In others, they are delayed, contested or abandoned altogether. This MAP captures the real-world footprint of that race — revealing patterns of growth, conflict and uncertainty.

I am watching as YOU, the communities show up and speak out. In the famous words of Mark Twain … “The secret of getting ahead is getting started,” so let’s go!

— Erin"  https://www.brockovichdatacenter.com/index.html
⚡

Energy Consumption

High energy usage contributes to significant environmental impact and escalating costs for surrounding communities.

💧

Water Usage

Cooling systems often require substantial water resources, straining local water supplies and ecosystems.

♻️

E-Waste

Frequent hardware upgrades and replacements generate significant volumes of electronic waste.

🌊

Location Risks

Natural disasters, flooding, or geopolitical instability can disrupt operations and impact local infrastructure.

📈

Scalability & Efficiency

Growing demand strains local resources and infrastructure, often outpacing community planning capacity.

🔊

Noise

Constant humming from cooling systems, generators, and substations can disrupt sleep, daily life, and wildlife in surrounding neighborhoods.

These challenges highlight the need for sustainable, secure, and efficient AI data center practices. If you would like to learn more, please follow our webpage and feel free to report any issues to me. Self-reporting is the best way we can get this information out to the public!

AI Data Centers Across the United States

A map of major AI data centers in the U.S. that are either operational or under construction, overlaid with locations where community members have emailed in concerns. Click any marker for details.

33
Operational
built & running
53
Under Construction
announced or building
34
Proposed
in pipeline / pending approval
3674
Community Reported
locations nationwide
Last updated: May 28, 2026

Not all DATA centers are on this map

There are over 4,000 data centers operating in the U.S., many built before the AI boom. This map isn't intended to show every data center. It's focused on locations where community members are actively voicing concerns. 
 

Communities Making a Difference

Across the U.S., residents, town councils, planning boards, and lawmakers are organizing, voting, and litigating to shape how AI data centers come to their towns. Here are concrete examples of that work — drawn from the 2,971+ reports Erin has received from 49 states, and from coverage by reputable news outlets.

15+
Moratoria & Pauses
passed at the local, county, or state level
 
66%
Voter Approval
for Port Washington's nation-first referendum
 
4
Council Members Ousted
in Festus, MO after a data center vote
 
19%
Reports Citing Secrecy
of community submissions mention NDAs, secret deals, meetings, or no public voice

⏸️Moratoriums & Pausestowns and counties pressing the brakes

When residents and councils want time to study the impact before approving more data centers, they're enacting temporary pauses. These moratoriums vary in duration and scope, but they share a goal: don't let the buildout get ahead of the planning.

 https://www.brockovichdatacenter.com/community-impact.html

 
   [AS ALWAYS PLEASE GO TO THE LINK TO READ GOOD ARTICLES (or quotes or watch videos) IN FULL: HELP SHAPE ALGORITHMS (and conversations) THAT EMPOWER DECENCY, DIGNITY, JUSTICE & PEACE... and hopefully Palestine]  
 

DATA Center backlash grows